Write Unit Tests for Critical Components (40% → 80% coverage) #159

Open
opened 2026-03-26 09:17:49 +01:00 by kincses · 0 comments
Owner

Objective: Increase unit test coverage from 40% to 80% for critical backend and frontend components.

Target Files:

  • Backend: directory
  • Frontend: directory
  • Critical components: API endpoints, services, models, utilities
  • Test frameworks: pytest (backend), Vitest/Jest (frontend)

Acceptance Criteria:

  1. Overall test coverage reaches 80%
  2. Critical business logic has 100% test coverage
  3. Tests run successfully in CI pipeline
  4. Mock data properly isolated from production database
  5. Test reports generated and accessible

Execution Steps:

  1. Audit current test coverage and identify gaps
  2. Write unit tests for untested critical components
  3. Add tests for edge cases and error scenarios
  4. Set up test data fixtures
  5. Integrate with coverage reporting
  6. Ensure tests run in isolated test database

Technical Details:

  • Estimated effort: 3 days
  • Dependencies: Phase 1-3 completion
  • Priority: P1 (quality assurance)
**Objective:** Increase unit test coverage from 40% to 80% for critical backend and frontend components. **Target Files:** - Backend: directory - Frontend: directory - Critical components: API endpoints, services, models, utilities - Test frameworks: pytest (backend), Vitest/Jest (frontend) **Acceptance Criteria:** 1. Overall test coverage reaches 80% 2. Critical business logic has 100% test coverage 3. Tests run successfully in CI pipeline 4. Mock data properly isolated from production database 5. Test reports generated and accessible **Execution Steps:** 1. Audit current test coverage and identify gaps 2. Write unit tests for untested critical components 3. Add tests for edge cases and error scenarios 4. Set up test data fixtures 5. Integrate with coverage reporting 6. Ensure tests run in isolated test database **Technical Details:** - Estimated effort: 3 days - Dependencies: Phase 1-3 completion - Priority: P1 (quality assurance)
kincses added this to the Phase 4: Testing & Deployment milestone 2026-03-26 09:17:49 +01:00
kincses added the Status: To DoScope: BackendScope: Frontend labels 2026-03-26 09:17:50 +01:00
Sign in to join this conversation.