Performance Optimization (Bundle Size, API Response Times) #161

Open
opened 2026-03-26 09:18:30 +01:00 by kincses · 0 comments
Owner

Objective: Optimize application performance by reducing bundle size and improving API response times.

Target Files:

  • Frontend: Bundle analysis, code splitting, lazy loading
  • Backend: API endpoint optimization, database query tuning
  • Database: Index optimization, query analysis
  • Monitoring: Performance metrics collection

Acceptance Criteria:

  1. Frontend bundle size reduced to <1.5MB (gzipped)
  2. API response times <100ms (95th percentile)
  3. Lighthouse performance score >90
  4. Database queries optimized with proper indexes
  5. Performance monitoring in place

Execution Steps:

  1. Analyze current performance bottlenecks
  2. Implement frontend code splitting and lazy loading
  3. Optimize database queries and add missing indexes
  4. Add caching for frequently accessed data
  5. Set up performance monitoring and alerts
  6. Run load tests to validate improvements

Technical Details:

  • Estimated effort: 2 days
  • Dependencies: Phase 1-3 completion
  • Priority: P1 (production readiness)
**Objective:** Optimize application performance by reducing bundle size and improving API response times. **Target Files:** - Frontend: Bundle analysis, code splitting, lazy loading - Backend: API endpoint optimization, database query tuning - Database: Index optimization, query analysis - Monitoring: Performance metrics collection **Acceptance Criteria:** 1. Frontend bundle size reduced to <1.5MB (gzipped) 2. API response times <100ms (95th percentile) 3. Lighthouse performance score >90 4. Database queries optimized with proper indexes 5. Performance monitoring in place **Execution Steps:** 1. Analyze current performance bottlenecks 2. Implement frontend code splitting and lazy loading 3. Optimize database queries and add missing indexes 4. Add caching for frequently accessed data 5. Set up performance monitoring and alerts 6. Run load tests to validate improvements **Technical Details:** - Estimated effort: 2 days - Dependencies: Phase 1-3 completion - Priority: P1 (production readiness)
kincses added this to the Phase 4: Testing & Deployment milestone 2026-03-26 09:18:30 +01:00
kincses added the Status: To DoScope: BackendScope: FrontendScope: Database labels 2026-03-26 09:18:30 +01:00
Sign in to join this conversation.