4.8 KiB
4.8 KiB
Masterbook 2.0 Project Status
Generated during Midnight Audit - Lead Project Manager
System Overview & Table Map (70+ Tables)
✅ Done:
- Database schema and Alembic migrations established for 5 domains (
identity,finance,fleet,gamification,system,vehicle,marketplace,audit). - Basic
AssetandVehiclemodels. - Triple Wallet architecture mapped (
wallets,financial_ledger). - Service Marketplace structure (
service_profiles,service_providers).
⚠️ Partially Done:
- Level 2 Asset Architecture (2-Step Creation Flow): The database supports the fields but the frontend/backend integration for the exact 2-step flow is incomplete.
- Financial & Expense Tracking: The
costsandasset_costs/vehicle.vehicle_expensesmapping needs alignment. Right now there are multiple expense tables (vehicle.costs,vehicle.asset_costs). - UI Components (Dashboard, Maps, Tables) are present in Vue/Nuxt but mocked. Need connection to real APIs.
❌ Missing:
- Resolution of 500/404 errors on endpoints (
/api/v1/assets,/api/v1/expenses). - Hard connection between Vue UI and Python FastAPI endpoints.
- Proper error handling for missing relations in 2-step asset creation.
The "Level 2" Asset Architecture
The system now enforces a strict 2-Step Asset Creation Process:
Step 1 (Draft Phase)
The user provides basic categorization info to create a "Draft" asset.
- Required Fields: Make, Model, Year.
- State: The asset is created in the database with limited capabilities.
Step 2 (Verification Phase)
To unlock full features (Marketplace, telematics, official history), the asset must be verified.
- Universal Primary Identifier: VIN (Vehicle Identification Number), HIN (Hull Identification Number), or generic Serial Number.
- Registration Number: License Plate, Tail Number, or Official Registration ID.
- State: The asset becomes fully "Active" and verified.
Backend & Integration Roadmap (Tomorrow's Sprint)
Phase 1: Fix Core Connectivity (The 500/404 Errors)
- Audit and fix the
/api/v1/assetsendpoints. Ensure the 2-step Level 2 Asset Architecture is correctly handled in the POST/PUT handlers. - Unify the Expense endpoints (
/api/v1/expenses). Connectvehicle.costscorrectly withasset_costs. Fix 500 errors caused by missing foreign keys.
Phase 2: Wire Frontend to Real APIs
- Health Monitor Dashboard: Replace mocked data with real system telemetry.
- User Management Table: Bind to the
identity.usersandidentity.personstables. - Financial Dashboard Tile: Query the
finance.financial_ledgerandidentity.walletstables.
Phase 3: Advanced UI Integrations
- Service Moderation Map: Connect the interactive map to the
marketplace.service_profilesspatial data (PostGIS). - AI Researcher Logs: Expose the
audit.process_logsand crawler queues to the admin UI. - Gamification Control Panel: Bind to
gamification.points_ledgerandgamification.competitions.
Strict Rule: Do not use mock data. All components must read/write to the PostgreSQL database.
Technical Audit & Gap Analysis (Backend & Frontend)
Backend Status (API & DB)
✅ What is Ready:
- Database Synchronization: The
sync_engine.pyconfirmed 100% synchronization between the 70+ SQLAlchemy models and the PostgreSQL database. No shadow tables or missing columns. - Data Models: Deep multi-schema support (
identity,finance,vehicle,marketplace,gamification, etc.) is fully established.
❌ What is Missing (To Be Developed):
- Broken Endpoints: Certain endpoints (
/api/v1/assets,/api/v1/expenses) are throwing 500/404 errors due to schema mismatches or missing relations. - Gamification Admin Controls: Endpoints for modifying game parameters, applying penalties, and assigning manual XP.
- TCO & Financial Aggregation: Backend routes returning unified analytics (Total Cost of Ownership) required by the dashboards.
- Marketplace Booking Flow: The "Service Request" and Geofenced Broadcast logic (from Epic 25.1) is missing from the API.
Frontend Status (Vue/Nuxt)
✅ What is Ready:
- Admin Dashboard Skeleton: The Nuxt.js admin panel UI is built, including tiles for Health Monitor, Gamification, Financials, and Service Moderation Map.
- Public Frontend Base: Vite/Vue project initiated.
❌ What is Missing (To Be Developed):
- Admin API Wiring: Every tile in the Admin Dashboard is currently using Mock Data. They must be wired to the real FastAPI endpoints.
- Epic 11 (Public Frontend - Dual UI): The entire "Smart Garage" concept is missing.
- The Profile Selector (Private Garage vs Corporate Fleet).
- Daily Quiz module and Trophy Showcase.
- Garage Tile System showing real vehicle brands and country flags.
- Quick Action Buttons (Add Expense, Find Service).